How to brief a developer so the quote is accurate
An inaccurate quote is almost always an inaccurate brief. Five questions fix most of it: who it is for, what they must be able to do, what it must connect to, who supplies the words and pictures, and what counts as finished. Answer those on one page and the numbers you get back will be comparable and close.
When a project goes over budget, the post-mortem usually blames estimating. More often the estimate was a reasonable answer to a question that was never properly asked.
You do not need a specification. You need one page that removes the ambiguity a developer would otherwise guess at — and guesses get padded, which is why vague briefs produce both high quotes and overruns.
1. Who is it for?
One or two sentences about the actual person using it. “Customers” is not an answer. “People in Bikaner looking for a hotel room for this weekend, mostly on a phone, mostly on patchy mobile data” is.
This changes real decisions: how much the thing can weigh, whether it must work on an older Android, whether English alone is enough.
2. What must they be able to do?
List actions, not pages. “Check availability for a date range”, “pay a deposit”, “get a confirmation on WhatsApp”. Each action can be built and tested; a page is a container that might hold anything.
Then mark each one day-one or later. This single step saves more money than any negotiation, because it lets a smaller thing go live sooner and earn while the rest is built.
3. What must it connect to?
Payments, accounting, stock, CRM, courier, WhatsApp, an existing database, the spreadsheet on somebody's laptop. Name them, including the awkward ones.
Undisclosed integrations are the main reason a quote doubles mid-project. Nobody hides them deliberately; they just do not feel like part of “the website” until the moment they obviously are.
4. Who supplies words and pictures?
Be honest rather than optimistic. If the answer is “we will write it”, set a date — the most common cause of a stalled project is a developer waiting on content.
If nobody on your side is really going to do it, say so and have it quoted. It costs less than three months of delay.
5. What counts as finished?
Agree the test before the work. “A customer can book a room and receive a confirmation, on a phone, and the booking appears in the office system” is a finish line. “The website is done” is not.
Also agree who signs it off. One person.
The one-page template
Copy this, fill it in, and send it to everyone you are asking. You will get comparable quotes, which is the real aim.
- What the business does, in two lines.
- Who will use this, and on what device.
- The actions they must be able to take, each marked day-one or later.
- Systems it must connect to, including spreadsheets and anything internal.
- Who supplies copy, photographs and logo, and by when.
- What counts as finished, and who signs it off.
- Budget range, and the date it needs to be live.
- Anything already decided that cannot change — a domain, a host, a brand guideline.
On sharing your budget
People withhold the budget to avoid being charged up to it. The cost of withholding is usually higher: without a range you get a quote for an imagined scope, and a serious studio cannot tell you what is achievable.
Give a range and ask what is possible within it. A good answer will tell you what to cut and what to phase. If the only answer is a number exactly matching your maximum, with no reasoning, that tells you something useful too.
If writing this feels like work you would rather not do alone, that is what the free first consultation is for: bring whatever you have, including nothing, and we will build the brief with you. Quick and budget tasks skip it entirely — just send the requirements.